在设定的最后期限的日期最早的病理基本上保证了时间表将被错过。即使是挑选“最有可能的日期”的策略是不是特别安全,因为对曲线峰值左面积仅三分之一。这表示,有三分之二的机会错过了最后期限。
— Waltzing with Bears: Managing Risk on Software Projects (华尔兹与熊:软件项目管理风险) (book) by Tom DeMarco, Timothy Lister